{"id":9951,"date":"2023-07-26T10:30:08","date_gmt":"2023-07-26T10:30:08","guid":{"rendered":"https:\/\/niagaraconstructionnews.com\/?p=9951"},"modified":"2023-07-26T10:30:51","modified_gmt":"2023-07-26T10:30:51","slug":"st-catharines-invites-feedback-on-waterfront-access-master-plan","status":"publish","type":"post","link":"https:\/\/niagaraconstructionnews.com\/?p=9951","title":{"rendered":"St. Catharines invites feedback on waterfront access master plan"},"content":{"rendered":"<p>Ontario Construction News staff writer<\/p>\n<p>The City of St. Catharines is seeking input for a Waterfront Access Master Plan (WAMP) that will focus on developing a long-term plan for waterfront access to the Lake Ontario shoreline.<\/p>\n<p><span style=\"color: #0000ff;\"><a style=\"color: #0000ff;\" href=\"https:\/\/www.dillon.ca\/home\">Dillon Consulting Limited<\/a><\/span> is leading the process and feedback will be considered. Once the WAMP is created, there will be a presentation to council in December 2023.<\/p>\n<p>The project study area includes the entire shoreline across the City of St. Catharines including the beaches, parks, trails and other access points along the waterfront. The City and Region have completed a number of studies and plans and these will be integrated into the city\u2019s WAMP.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-64975\" src=\"https:\/\/www.ontarioconstructionnews.com\/wp-content\/uploads\/2023\/07\/st.-catharines-2.png\" alt=\"st catherines 2\" width=\"1008\" height=\"663\" \/>Feedback can be submitted through an <span style=\"color: #0000ff;\"><a style=\"color: #0000ff;\" href=\"http:\/\/www.engagestc.ca\/wamp-survey\">online survey<\/a><\/span> until Aug. 11.<\/p>\n<p>\u201cUnlocking the full potential of our waterfront lies in collaboration and active participation with the community,\u201d said Design and Construction Engineer Jocelyn St. Denis. \u201cOnce we have feedback from residents on how people are accessing and using the City\u2019s waterfront and what updates they\u2019d like to see, we can use that info to assist in establishing a strong master plan.\u201d<\/p>\n<p>The survey is divided into two parts. The first section includes questions aimed at identifying current usage patterns, existing access points and comments on the effectiveness of the current infrastructure. Part two includes an interactive map to suggest new waterfront access points, areas in need of improvement and acceptable current access points.<\/p>\n<p>The project is currently in the evaluation phase. This stage includes public consultation and will last until October 2023. A draft WAMP will be created and presented to city council.<\/p>\n<p>In 2021, emergency shoreline protection was implemented, closing the stairs used for access to the waterfront in the Abbey Mews area of Port Dalhousie. Also, additional existing staircases to access the water were identified as reaching their end of life. Staff has been considering potential features that would reinstate public access to Lake Ontario and protect the shoreline.<\/p>\n<p>The WAMP will aim to ensure equitable access across the St. Catharines shoreline.<\/p>\n<p>There are three phases to this project.<\/p>\n<ul>\n<li>Phase 1 \u2013 Project Launch \/ Background Study (May \u2013 June 2023)<\/li>\n<li>Phase 2 \u2013Waterfront Access Evaluation (June \u2013 October 2023)<\/li>\n<li>Phase 3 \u2013 Waterfront Access Master Plan (October \u2013 December 2023)<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Ontario Construction News staff writer The City of St. Catharines is seeking input for a Waterfront Access Master Plan (WAMP) that will focus on developing a long-term plan for waterfront access to the Lake Ontario shoreline. Dillon Consulting Limited is leading the process and feedback will be considered. Once the WAMP is created, there will [&hellip;]<\/p>\n","protected":false},"author":10,"featured_media":9952,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"tdm_status":"","tdm_grid_status":"","footnotes":""},"categories":[34,64,41,29],"tags":[],"class_list":{"0":"post-9951","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-architecture","8":"category-featured","9":"category-local-news","10":"category-current-news"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>St. Catharines invites feedback on waterfront access master plan - Niagara Construction News<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/niagaraconstructionnews.com\/?p=9951\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"St. Catharines invites feedback on waterfront access master plan - Niagara Construction News\" \/>\n<meta property=\"og:description\" content=\"Ontario Construction News staff writer The City of St. Catharines is seeking input for a Waterfront Access Master Plan (WAMP) that will focus on developing a long-term plan for waterfront access to the Lake Ontario shoreline. Dillon Consulting Limited is leading the process and feedback will be considered. Once the WAMP is created, there will [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/niagaraconstructionnews.com\/?p=9951\" \/>\n<meta property=\"og:site_name\" content=\"Niagara Construction News\" \/>\n<meta property=\"article:published_time\" content=\"2023-07-26T10:30:08+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-07-26T10:30:51+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/niagaraconstructionnews.com\/wp-content\/uploads\/2023\/07\/st-catharines.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1095\" \/>\n\t<meta property=\"og:image:height\" content=\"497\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Mark Buckshon\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Mark Buckshon\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/niagaraconstructionnews.com\\\/?p=9951#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/niagaraconstructionnews.com\\\/?p=9951\"},\"author\":{\"name\":\"Mark Buckshon\",\"@id\":\"https:\\\/\\\/niagaraconstructionnews.com\\\/#\\\/schema\\\/person\\\/05b8e9532cfd7ab38ddf01882e7c6bfc\"},\"headline\":\"St. Catharines invites feedback on waterfront access master plan\",\"datePublished\":\"2023-07-26T10:30:08+00:00\",\"dateModified\":\"2023-07-26T10:30:51+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/niagaraconstructionnews.com\\\/?p=9951\"},\"wordCount\":369,\"commentCount\":0,\"image\":{\"@id\":\"https:\\\/\\\/niagaraconstructionnews.com\\\/?p=9951#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/niagaraconstructionnews.com\\\/wp-content\\\/uploads\\\/2023\\\/07\\\/st-catharines.png\",\"articleSection\":[\"Architecture\",\"Featured\",\"Local News\",\"Projects\\\/opportunities\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/niagaraconstructionnews.com\\\/?p=9951#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/niagaraconstructionnews.com\\\/?p=9951\",\"url\":\"https:\\\/\\\/niagaraconstructionnews.com\\\/?p=9951\",\"name\":\"St. Catharines invites feedback on waterfront access master plan - Niagara Construction News\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/niagaraconstructionnews.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/niagaraconstructionnews.com\\\/?p=9951#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/niagaraconstructionnews.com\\\/?p=9951#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/niagaraconstructionnews.com\\\/wp-content\\\/uploads\\\/2023\\\/07\\\/st-catharines.png\",\"datePublished\":\"2023-07-26T10:30:08+00:00\",\"dateModified\":\"2023-07-26T10:30:51+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/niagaraconstructionnews.com\\\/#\\\/schema\\\/person\\\/05b8e9532cfd7ab38ddf01882e7c6bfc\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/niagaraconstructionnews.com\\\/?p=9951#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/niagaraconstructionnews.com\\\/?p=9951\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/niagaraconstructionnews.com\\\/?p=9951#primaryimage\",\"url\":\"https:\\\/\\\/niagaraconstructionnews.com\\\/wp-content\\\/uploads\\\/2023\\\/07\\\/st-catharines.png\",\"contentUrl\":\"https:\\\/\\\/niagaraconstructionnews.com\\\/wp-content\\\/uploads\\\/2023\\\/07\\\/st-catharines.png\",\"width\":1095,\"height\":497,\"caption\":\"St Catherines\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/niagaraconstructionnews.com\\\/?p=9951#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/niagaraconstructionnews.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"St. Catharines invites feedback on waterfront access master plan\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/niagaraconstructionnews.com\\\/#website\",\"url\":\"https:\\\/\\\/niagaraconstructionnews.com\\\/\",\"name\":\"Niagara Construction News\",\"description\":\"News and information for the Niagara region&#039;s architectural, engineering and construction community\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/niagaraconstructionnews.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/niagaraconstructionnews.com\\\/#\\\/schema\\\/person\\\/05b8e9532cfd7ab38ddf01882e7c6bfc\",\"name\":\"Mark Buckshon\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b9695bf5da59778222ce0a7b1e119d740314c4d718df668467b714dc75313379?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b9695bf5da59778222ce0a7b1e119d740314c4d718df668467b714dc75313379?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b9695bf5da59778222ce0a7b1e119d740314c4d718df668467b714dc75313379?s=96&d=mm&r=g\",\"caption\":\"Mark Buckshon\"},\"url\":\"https:\\\/\\\/niagaraconstructionnews.com\\\/?author=10\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"St. Catharines invites feedback on waterfront access master plan - Niagara Construction News","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/niagaraconstructionnews.com\/?p=9951","og_locale":"en_US","og_type":"article","og_title":"St. Catharines invites feedback on waterfront access master plan - Niagara Construction News","og_description":"Ontario Construction News staff writer The City of St. Catharines is seeking input for a Waterfront Access Master Plan (WAMP) that will focus on developing a long-term plan for waterfront access to the Lake Ontario shoreline. Dillon Consulting Limited is leading the process and feedback will be considered. Once the WAMP is created, there will [&hellip;]","og_url":"https:\/\/niagaraconstructionnews.com\/?p=9951","og_site_name":"Niagara Construction News","article_published_time":"2023-07-26T10:30:08+00:00","article_modified_time":"2023-07-26T10:30:51+00:00","og_image":[{"width":1095,"height":497,"url":"https:\/\/niagaraconstructionnews.com\/wp-content\/uploads\/2023\/07\/st-catharines.png","type":"image\/png"}],"author":"Mark Buckshon","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Mark Buckshon","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/niagaraconstructionnews.com\/?p=9951#article","isPartOf":{"@id":"https:\/\/niagaraconstructionnews.com\/?p=9951"},"author":{"name":"Mark Buckshon","@id":"https:\/\/niagaraconstructionnews.com\/#\/schema\/person\/05b8e9532cfd7ab38ddf01882e7c6bfc"},"headline":"St. Catharines invites feedback on waterfront access master plan","datePublished":"2023-07-26T10:30:08+00:00","dateModified":"2023-07-26T10:30:51+00:00","mainEntityOfPage":{"@id":"https:\/\/niagaraconstructionnews.com\/?p=9951"},"wordCount":369,"commentCount":0,"image":{"@id":"https:\/\/niagaraconstructionnews.com\/?p=9951#primaryimage"},"thumbnailUrl":"https:\/\/niagaraconstructionnews.com\/wp-content\/uploads\/2023\/07\/st-catharines.png","articleSection":["Architecture","Featured","Local News","Projects\/opportunities"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/niagaraconstructionnews.com\/?p=9951#respond"]}]},{"@type":"WebPage","@id":"https:\/\/niagaraconstructionnews.com\/?p=9951","url":"https:\/\/niagaraconstructionnews.com\/?p=9951","name":"St. Catharines invites feedback on waterfront access master plan - Niagara Construction News","isPartOf":{"@id":"https:\/\/niagaraconstructionnews.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/niagaraconstructionnews.com\/?p=9951#primaryimage"},"image":{"@id":"https:\/\/niagaraconstructionnews.com\/?p=9951#primaryimage"},"thumbnailUrl":"https:\/\/niagaraconstructionnews.com\/wp-content\/uploads\/2023\/07\/st-catharines.png","datePublished":"2023-07-26T10:30:08+00:00","dateModified":"2023-07-26T10:30:51+00:00","author":{"@id":"https:\/\/niagaraconstructionnews.com\/#\/schema\/person\/05b8e9532cfd7ab38ddf01882e7c6bfc"},"breadcrumb":{"@id":"https:\/\/niagaraconstructionnews.com\/?p=9951#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/niagaraconstructionnews.com\/?p=9951"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/niagaraconstructionnews.com\/?p=9951#primaryimage","url":"https:\/\/niagaraconstructionnews.com\/wp-content\/uploads\/2023\/07\/st-catharines.png","contentUrl":"https:\/\/niagaraconstructionnews.com\/wp-content\/uploads\/2023\/07\/st-catharines.png","width":1095,"height":497,"caption":"St Catherines"},{"@type":"BreadcrumbList","@id":"https:\/\/niagaraconstructionnews.com\/?p=9951#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/niagaraconstructionnews.com\/"},{"@type":"ListItem","position":2,"name":"St. Catharines invites feedback on waterfront access master plan"}]},{"@type":"WebSite","@id":"https:\/\/niagaraconstructionnews.com\/#website","url":"https:\/\/niagaraconstructionnews.com\/","name":"Niagara Construction News","description":"News and information for the Niagara region&#039;s architectural, engineering and construction community","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/niagaraconstructionnews.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/niagaraconstructionnews.com\/#\/schema\/person\/05b8e9532cfd7ab38ddf01882e7c6bfc","name":"Mark Buckshon","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/b9695bf5da59778222ce0a7b1e119d740314c4d718df668467b714dc75313379?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/b9695bf5da59778222ce0a7b1e119d740314c4d718df668467b714dc75313379?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b9695bf5da59778222ce0a7b1e119d740314c4d718df668467b714dc75313379?s=96&d=mm&r=g","caption":"Mark Buckshon"},"url":"https:\/\/niagaraconstructionnews.com\/?author=10"}]}},"_links":{"self":[{"href":"https:\/\/niagaraconstructionnews.com\/index.php?rest_route=\/wp\/v2\/posts\/9951","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/niagaraconstructionnews.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/niagaraconstructionnews.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/niagaraconstructionnews.com\/index.php?rest_route=\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/niagaraconstructionnews.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=9951"}],"version-history":[{"count":1,"href":"https:\/\/niagaraconstructionnews.com\/index.php?rest_route=\/wp\/v2\/posts\/9951\/revisions"}],"predecessor-version":[{"id":9953,"href":"https:\/\/niagaraconstructionnews.com\/index.php?rest_route=\/wp\/v2\/posts\/9951\/revisions\/9953"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/niagaraconstructionnews.com\/index.php?rest_route=\/wp\/v2\/media\/9952"}],"wp:attachment":[{"href":"https:\/\/niagaraconstructionnews.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=9951"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/niagaraconstructionnews.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=9951"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/niagaraconstructionnews.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=9951"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}